New construction with UBE NG system – the Spurwerk at Bremen freight station
Project details
- Object: Spurwerk Bremen
- Place: Bremen
- Country: Germany
- Building type: Commerce & Industry
- Type of construction: New construction
- Completion: 2024
- SYSTEA wall brackets: Stainless steel
- SYSTEA profile system: UBE-NG
- Cladding material: Rieder formparts
- Fixing: Rieder system brackets
- Architects: Westphal Architekten BDA
- Fabricator: Kohlmeyer Fassadenbau Handelsgesellschaft mbH &Co.KG
- Photos: SYSTEA, Rieder
Kick-off for the former Bremen freight station
The Spurwerk is the first completed building on the approximately 90,000 m² site of the former Neustadt freight station in Bremen.
The mixed-use project combines commercial, craft, office, and restaurant space.
Designed by Westphal Architekten BDA, the building is aiming for DGNB Gold certification.
Challenge & planning approach
The facade has a significant impact on the urban appearance: Distinctive, arrow-shaped moulded parts made of anthracite-coloured fibreglass-reinforced concrete meet traditional bricks, creating a modern, distinctive overall look.
The challenge was to find a solution that combines design quality with technical precision and high installation efficiency.
SYSTEA UBE NG in use
The SYSTEA UBE-NG system was used for the sub-structure. In close cooperation with the fabricator Kohlmeyer Fassadenbau Handelsgesellschaft mbH & Co. KG and the cladding manufacturer Rieder, it was possible to implement an economical, secure, and thermally optimized fixing system for the large-format 3D-moulded parts.
Advantages of the UBE profile system
- Flexible: suitable for different panel materials and formats
- Precise: enables a precise, tension-free fastening even with complex geometries
- Sustainable: thermally optimized and durable – ideal for certified buildings, also completely removable and 100% recyclable materials made of high-quality stainless steel and aluminum
The strength of the UBE profile system is particularly evident in demanding projects such as the Spurwerk Bremen:
It combines architectural freedom with maximum technical safety.
Implementation & installation
Thanks to the SYSTEA UBE NG system, the large-format facade elements could be installed efficiently. Precise advance planning and the high dimensional accuracy of the profiles ensured fast, safe, and high-quality implementation.
Conclusion
- Design: Three-dimensional, dynamic facade structure with depth effect
- Safety: Concealed, thermally optimized fixing thanks to stainless steel wall brackets
- Efficiency: Significantly reduced installation times on the construction site
- Sustainability: Durable solution for a DGNB Gold-compliant building
All news at a glance – The SYSTEA newsletter
Every month we inform you about the latest developments regarding our products, recently completed projects and our team.




















